Skip to content
RailForgeRFScore

Hub: Ports

Port rail consulting

Port rail consulting should treat rail as the spine of the port strategy: connector bottlenecks, intermodal capacity, cargo-diversion economics, funding path, and executable scope.

Chicago and Northwestern rail yard, Jack Delano, December 1942.
Price
$25/75k
Cash
50% upfront
Cycle
10 days

What this does

Three deliverables. One operating record per corridor.

Evidence

Observed facts, source documents, stakeholders, constraints, and open diligence are separated from inference.

Authority Path

ROW, NEPA, STB, Buy America, BABA, safety responsibility, and owner-standard questions are surfaced early.

Decision

The output is a next-action memo. Proceed, pause, kill, or gather specific evidence before engineering spend.

Sources and evidence

Public claims tied to source records.

wedge_fit

Intermodal connectors concentrate freight bottlenecks at tractable local interfaces.

Claim claim_intermodal_connector_wedge · Confidence medium · Caveat: Local ownership and environmental constraints vary heavily.

FHWA: FHWA Intermodal Freight Connectors

us_freight_capex_annual

U.S. freight railroads invest large annual private capital into maintenance and capacity.

Claim claim_freight_capex_private · Confidence medium · Caveat: Industry-source figure; validate with Class I filings before investor use.

AAR: Freight Rail Investments

Compliance caveat

Evidence first. Certification never implied.

FRA Track Safety

Map applicability before scope claims

Required owner: track owner / responsible railroad

FRA Roadway Worker Protection

Identify responsible party and exclusions

Required owner: roadway worker employer / railroad

FRA Bridge Safety

Do not opine on capacity without qualified review

Required owner: track owner / bridge engineer

FRA Grade Crossing

Flag crossing authority path

Required owner: railroad / road authority

FRA Signal and Train Control

Exclude or route to signal specialist

Required owner: responsible railroad / signal maintainer

Buy America / BABA

Create item-level compliance ledger

Required owner: sponsor / procurement lead

NEPA / Environmental

Classify authority path; do not bury as scalar risk

Required owner: sponsor / lead agency

STB / Common Carrier Authority

Require legal screen before buildability claims

Required owner: sponsor / rail counsel

Right of Way

Use as hard gate before scoring

Required owner: owner / sponsor

Procurement / Contracting

Add contract archetype and exclusions

Required owner: sponsor / contracting lead

Start here

Send one named bottleneck.

Tell us the corridor, owner, scorecard result, constraint, deadline, and procurement path. The first reply is a fit screen, record request, and recommendation on whether the 10-day brief is the right step.

Capability packet, W-9, COI, NDA, and scope letter available on request.

Posts to RailForge intake. No third-party form host. No tracking pixel. Capability packet, NDA, COI, W-9, and scope letter available on request.