Skip to content
RailForgeRFScore
All corridors

Pacific region / STRACNET corridor

Marine Corps Base Camp Pendleton to Port of Long Beach

Region
Pacific

CA

Primary owner
BNSF

+ Pacific Sun Railroad, Pacific Harbor Line

Length
90 mi
Status
Estimate, requires primary-source confirmation

Confidence: low

Estimated, confirm with FRA or MARAD source

Routing, mileage, and operator wiring on this corridor are inferred from public references. Treat as planning-grade context only. Backfill with SDDC TEA, FRA Office of Railroad Safety, MARAD strategic ports, or a recent CRISI award document before this row goes in a brief or grant narrative.

Field notes

I Marine Expeditionary Force outload routing. Spur condition through Camp Pendleton is a documented STRACNET concern. (estimate)

Military endpoint
Marine Corps Base Camp Pendleton (CA)
Port endpoint
Port of Long Beach (CA)
Max axle load
286k
Plate clearance
Plate F
Electrified
No
Federal funding
CRISI Yes / RRIF Yes

What we’d brief on this corridor

A 10-day corridor brief turns this row into a fundable scope.

  • Constraint register. Bridge ratings, tunnel clearance, axle load gaps, and short-line interchange limits along the BNSF, Pacific Sun Railroad, Pacific Harbor Line routing.
  • Authority chain. SDDC TEA designation, FRA Office of Railroad Safety oversight, and the state DOT touchpoints between CA.
  • Funding map. CRISI eligibility: Yes. RRIF eligibility: Yes. Defense Access Roads where the spur work qualifies.
  • Capital decision. A go or no-go on whether heavy engineering spend is the right next step, with the source records that back each claim.

Brief: Marine Corps Base Camp Pendleton to Port of Long Beach

Send the corridor and the constraint.

Tell us the corridor, owner, scorecard result, constraint, deadline, and procurement path. The first reply is a fit screen, record request, and recommendation on whether the 10-day brief is the right step.

Capability packet, W-9, COI, NDA, and scope letter available on request.

Posts to RailForge intake. No third-party form host. No tracking pixel. Capability packet, NDA, COI, W-9, and scope letter available on request.