Southeast region / STRACNET corridor
Fort Campbell to Port of Jacksonville
- Region
- Southeast
- Primary owner
- CSX
- Length
- 780 mi
- Status
- Estimate, requires primary-source confirmation
KY,TN,GA,FL
Confidence: low
Estimated, confirm with FRA or MARAD source
Routing, mileage, and operator wiring on this corridor are inferred from public references. Treat as planning-grade context only. Backfill with SDDC TEA, FRA Office of Railroad Safety, MARAD strategic ports, or a recent CRISI award document before this row goes in a brief or grant narrative.
Field notes
101st Airborne Division Air Assault outload routing to Blount Island Marine Terminal and to MOTSU as an alternate. (estimate)
What we’d brief on this corridor
A 10-day corridor brief turns this row into a fundable scope.
- Constraint register. Bridge ratings, tunnel clearance, axle load gaps, and short-line interchange limits along the CSX routing.
- Authority chain. SDDC TEA designation, FRA Office of Railroad Safety oversight, and the state DOT touchpoints between KY,TN,GA,FL.
- Funding map. CRISI eligibility: Yes. RRIF eligibility: Yes. Defense Access Roads where the spur work qualifies.
- Capital decision. A go or no-go on whether heavy engineering spend is the right next step, with the source records that back each claim.