Southeast region / STRACNET corridor
Fort Liberty to Charleston
- Region
- Southeast
- Primary owner
- CSX
- Length
- 260 mi
- Status
- Estimate, requires primary-source confirmation
NC,SC
+ Norfolk Southern, Palmetto Railways
Confidence: low
Estimated, confirm with FRA or MARAD source
Routing, mileage, and operator wiring on this corridor are inferred from public references. Treat as planning-grade context only. Backfill with SDDC TEA, FRA Office of Railroad Safety, MARAD strategic ports, or a recent CRISI award document before this row goes in a brief or grant narrative.
Field notes
Alternate Atlantic outload routing to the Charleston port complex via interchange to Palmetto Railways switching at the Naval Weapons Station. (estimate)
What we’d brief on this corridor
A 10-day corridor brief turns this row into a fundable scope.
- Constraint register. Bridge ratings, tunnel clearance, axle load gaps, and short-line interchange limits along the CSX, Norfolk Southern, Palmetto Railways routing.
- Authority chain. SDDC TEA designation, FRA Office of Railroad Safety oversight, and the state DOT touchpoints between NC,SC.
- Funding map. CRISI eligibility: Yes. RRIF eligibility: Yes. Defense Access Roads where the spur work qualifies.
- Capital decision. A go or no-go on whether heavy engineering spend is the right next step, with the source records that back each claim.